0xsline/OpenChatCut

★ 2,743⑂ 0

Open-source, local-first conversational AI video editor with a professional multi-track timeline, Agent Skills, MCP integration, and Remotion rendering.

About 0xsline/OpenChatCut

0xsline/OpenChatCut is an open-source project on GitHub, mainly written in TypeScript. Open-source, local-first conversational AI video editor with a professional multi-track timeline, Agent Skills, MCP integration, and Remotion rendering. It currently holds 2,743 stars and 0 forks with 0 open issues, and was last pushed on an unknown date (repository created unknown).

Project Overview

Git Homed tracks it on the Video Trending board and on the AI Video Trending list.

GitHub Repository Details

Repository 0xsline/OpenChatCut · default branch - · size 0 KB · watchers 0 · source: GitHub REST API and repository README

README

https://github.com/0xsline/OpenChatCut/blob/HEAD/OpenChatCut

OpenChatCut

简体中文 · English

Open-source ChatCut alternative · agent-native · local-first AI video editor

Let Codex, Claude Code, and the built-in agent read, edit, and export real video projects that remain fully editable. Website: openchatcut.com

OpenChatCut Pro · Desktop edition: install it and start cutting

Introduction · Product Tour · Quick Start · Agent / MCP · Community · Sponsors · Changelog · Star Growth · Contributing

https://github.com/0xsline/OpenChatCut/blob/HEAD/GitHub Repository https://github.com/0xsline/OpenChatCut/blob/HEAD/Discord Community https://github.com/0xsline/OpenChatCut/blob/HEAD/Status https://github.com/0xsline/OpenChatCut/blob/HEAD/Local First https://github.com/0xsline/OpenChatCut/blob/HEAD/TypeScript https://github.com/0xsline/OpenChatCut/blob/HEAD/React https://github.com/0xsline/OpenChatCut/blob/HEAD/Remotion https://github.com/0xsline/OpenChatCut/blob/HEAD/Electron https://github.com/0xsline/OpenChatCut/blob/HEAD/MCP https://github.com/0xsline/OpenChatCut/blob/HEAD/AtomGit G-Star

https://github.com/0xsline/OpenChatCut/blob/HEAD/OpenChatCut - Open-source AI agent video editor with a real timeline | Product Hunt

https://github.com/0xsline/OpenChatCut/blob/HEAD/OpenChatCut editor overview with the agent workspace, media pool, preview, and multitrack timeline

From a single instruction to a real timeline: agents, media, previews, motion graphics, transitions, effects, and multitrack audio all work together in one project.

---

Sponsors

https://github.com/0xsline/OpenChatCut/blob/HEAD/OfoxAI

OfoxAI: Text, image, and video AI in one platform

OfoxAI is a unified API platform for text, image, and video AI, with video models from the Seedance, MiniMax (Hailuo), and Wan families. Choose models for AI applications, agents, creative ideation, image generation, and video assets through one platform. Explore OfoxAI models and APIs →


If OpenChatCut helps you, you can support its continued development on Ko-fi or Afdian.

https://github.com/0xsline/OpenChatCut/blob/HEAD/Support me on Ko-fi https://github.com/0xsline/OpenChatCut/blob/HEAD/Support OpenChatCut on Afdian

---

What is OpenChatCut?

OpenChatCut is an open-source ChatCut alternative: a video editor that brings conversational agents and professional timeline editing into the same workspace. It is independent open source (AGPL), not affiliated with the commercial ChatCut product.

OpenChatCut = local video projects + multitrack timeline + AI agents + MCP + production-ready exports.

It does not merely generate a video that can no longer be changed. Every edit is written to real tracks, clips, transitions, captions, effects, and media inside the project. You can continue editing manually, undo or redo changes, save versions, or hand the project to another agent.

OpenChatCut is built for creators and developers who want AI to participate in the actual editing workflow without giving up professional control, rather than starting over from an empty chat box or an immutable generated result.

Community

Join the OpenChatCut community to discuss workflows, share feedback, and follow development:


https://github.com/0xsline/OpenChatCut/blob/HEAD/OpenChatCut WeChat community QR code

---

Product Tour

The following screenshots show real OpenChatCut projects and editor states, not static mockups.

https://github.com/0xsline/OpenChatCut/blob/HEAD/OpenChatCut local project dashboard
Local project management — Create, import, duplicate, export, and continue editing multiple real projects.
https://github.com/0xsline/OpenChatCut/blob/HEAD/An agent generating music and editing transitions on a multitrack timeline
Complete agent-driven editing — Generate music, invoke tools, and write transitions, captions, and multitrack media directly to the timeline.
https://github.com/0xsline/OpenChatCut/blob/HEAD/Agent tool execution history and the Motion Graphics library
Motion Graphics and agents — Browse motion templates or let an agent generate and assemble editable MG clips.
https://github.com/0xsline/OpenChatCut/blob/HEAD/OpenChatCut WebGL visual effects library
WebGL visual effects — Apply pixelation, duotone, fisheye, kaleidoscope, softening, light leaks, and more directly to clips.
https://github.com/0xsline/OpenChatCut/blob/HEAD/OpenChatCut camera movement and zoom effects library
Camera movement and zoom — Push, pull, slow zoom, fast zoom, and eased camera effects work directly with the timeline.
https://github.com/0xsline/OpenChatCut/blob/HEAD/Comparing LUT color styles in OpenChatCut using a Tokyo Tower reference image
LUTs and color styles — Compare camera transforms and film looks in real time against a consistent reference frame.

---

Why OpenChatCut?

Traditional editors excel at precise control. One-shot AI video generators excel at producing results quickly. OpenChatCut connects both approaches through one continuously editable project:

| Capability | Traditional timeline editor | One-shot AI video generation | OpenChatCut | |---|:---:|:---:|:---:| | Track- and clip-level precision | ✅ | ❌ | ✅ | | Modify a project with natural language | ❌ | ✅ | ✅ | | Inspectable and undoable changes | ✅ | Usually unavailable | ✅ | | Linked transcript and visuals | Partial | ❌ | ✅ | | Direct control from Codex / Claude Code | ❌ | ❌ | ✅ MCP | | Built-in and external agent collaboration | ❌ | ❌ | ✅ Shared tools | | Local projects and BYOK | Product-dependent | Usually cloud-based | ✅ |

The core editing loop:

Describe the goal → Agent reads the project → Produces verifiable edits → Writes to the timeline
                  → Preview / adjust / undo → Captions and mixing → Export

---

Core Capabilities

| Area | Implemented capabilities | |---|---| | Timeline | Multitrack editing, move, trim, split, ripple edits, snapping, keyframes, markers, undo, and redo | | Visuals | WebGL effects, LUTs, chroma key, zoom, transitions, and custom shaders | | Audio | Multiple audio tracks, sound effects, background music, voice-over recording, loudness, auto-ducking, and vocal isolation | | Transcript | Transcription jobs, word-level editing, pause compression, search, speakers, and clip views | | Captions | Automatic captions, named styles, translation, timeline overlays, and SRT export | | Motion Graphics | Built-in templates, a secure sandbox, custom templates, and video rendering | | AI generation | Image, video, speech, music, and sound-effect jobs with progress tracking | | Media | Uploads, folders, online image/video/audio search, and Firecrawl visual-media fallback | | Export | MP4, audio, captions, FCPXML, project import/export, export history, hardware-aware H.264 acceleration, and resource-aware export queueing | | Publishing | Agent-driven publishing of finished renders to TikTok, Instagram, YouTube, LinkedIn, Facebook, X, Threads, Pinterest, and Bluesky via Upload-Post, with a preview and explicit confirmation first | | Agent | Built-in conversational agent, skills, proposal-based edits, and external Streamable HTTP MCP |

---

Community Resources

The OpenChatCut resource library is a shared catalog for reusable MG animations, sound effects, transitions, visual effects, zooms, and LUTs.

https://github.com/0xsline/OpenChatCut/blob/HEAD/OpenChatCut community resource library

Discover and install

Contribute a resource

1. Open Contribute a resource and choose its category. 2. Upload the resource and the category-specific preview inputs; the site renders the published preview. 3. Add the creator and license information, then submit it for review and publication.

Installable visual resources use the editor's openchatcut-plugin@1 format and runtime validation. Official OpenChatCut resources use the MIT license; community contributors select a license during submission, and each published card identifies its creator and license.

---

Use Cases

Workflow

1. Create a project and import local media. 2. Edit manually on the timeline or describe the result you want. 3. The agent reads project context and invokes editing tools. 4. Review the proposal and preview the result, then apply, adjust, or undo it. 5. Finish captions, audio, effects, and color. 6. Export video, audio, captions, FCPXML, or the complete project.

---

Quick Start

Desktop installers

Download the latest macOS, Windows, and Linux builds from GitHub Releases. The release currently includes DMG installers for Apple Silicon and Intel Macs, an x64 Windows installer, and an x64 Linux AppImage.

These are early builds. The macOS packages are not yet signed or notarized, so the operating system may require manual approval on first launch.

Run from source

Requires Node.js 24.x and npm. The supported Node.js range is enforced by package.json, and .nvmrc selects the matching major version for Node version managers.

On Linux x64, npm install also downloads ONNX Runtime's optional CUDA provider (several hundred MB from NuGet). For a CPU-only install, run ONNXRUNTIME_NODE_INSTALL=skip npm install instead.

git clone https://github.com/0xsline/OpenChatCut.git
cd OpenChatCut
npm install
cp .env.example .env.local
npm run dev

Open:

http://localhost:5199

The editor needs a browser secure context: open OpenChatCut at http://localhost or http://127.0.0.1 on the machine running it, or serve it over HTTPS. Over plain HTTP from another device (a LAN IP or reverse proxy), browsers disable Web Crypto, WebCodecs, and the clipboard, so the project list still loads but the editor shows this requirement instead of opening.

Only add the model or media-service credentials you actually use to .env.local. Features without configured third-party credentials report the missing key explicitly; local timeline editing, built-in media, and other configured capabilities continue to work.

Development launches are isolated per Git checkout/worktree by default. npm run dev and npm run desktop:dev keep that checkout's projects, imported media, generation jobs, credentials, settings, and local authorization state under its own profile in ~/.openchatcut/dev-profiles/. Use npm run dev:shared only when you intentionally need the legacy shared development store.

Built-in Agent authentication

The built-in Agent always runs the model loop on the local server. Chat, drafts, and proposals survive page refreshes and local service restarts. Timeline changes still go through the active editor's validated, undoable commands.

Agent local-path access (advanced)

Desktop agents can browse any local directory allowed by the operating system by default, including mounted media drives. browse_local_media lists folders and supported media, searches by filename or relative path and media type, and returns paginated results without importing. The agent can then use import_assets for up to 100 selected paths, import_asset for one path, or import_folder for a whole folder. Imports reuse media probing and reference registration, preserve source files, and skip duplicate content, including duplicates within one batch. Document files such as TXT, Markdown, DOCX, and PDF should be attached to chat instead. In the desktop app these tools are enabled by default; in a browser session they also work, but only for directories listed in AGENT_IMPORT_ROOTS and while the editor is served from the same machine that runs OpenChatCut.

To restrict local access, set a comma-separated value such as AGENT_IMPORT_ROOTS=/Volumes/Media,D:\Projects in .env.local; leave it empty for default unrestricted directory access in the desktop app (a browser session requires the allowlist and refuses these tools while it is empty). Explicit restrictions apply to both browsing and import. Source checkouts read the repository file at startup. Packaged desktop builds read it from Electron's user-data directory: ~/Library/Application Support/OpenChatCut/ on macOS, %APPDATA%\OpenChatCut\ on Windows, and $XDG_CONFIG_HOME/OpenChatCut/ (normally ~/.config/OpenChatCut/) on Linux. Restart after editing the file.

Local H.264 exports automatically prefer VideoToolbox on macOS and NVENC on compatible Windows systems, then fall back to software encoding. Tune render concurrency and the heavy-export limit with OPENCHATCUT_RENDER_CONCURRENCY and OPENCHATCUT_MAX_ACTIVE_EXPORTS, disable hardware encoding with OPENCHATCUT_DISABLE_HARDWARE_ENCODING, or override FFmpeg-side encoder selection with OPENCHATCUT_H264_ENCODER; see .env.example.

On Apple Silicon, more render workers can slow down video-heavy exports even when VideoToolbox encoding is active. See macOS render tuning for an M4 Max benchmark and a way to test your own workload. These measurements do not establish a default for other Macs or Windows.

Desktop development

npm run desktop:dev

The desktop app uses an Electron shell with the same embedded services. The web development build and desktop build share project, agent, generation, and export logic.

---

Project Status

OpenChatCut is under active development. The editor, project format, and agent tools will continue to evolve. Prebuilt macOS, Windows, and Linux installers are published on GitHub Releases; running from source remains the most transparent option for development and troubleshooting.

The core timeline, local projects, built-in media, and manual editing do not depend on cloud services. Connected features such as AI models, online media, generation, and transcription are enabled only after you configure the corresponding services.

---

Using OpenChatCut with Codex / Claude Code

Install the single OpenChatCut Agent Skill:

npx skills add 0xsline/OpenChatCut

Then tell the agent Set up OpenChatCut. The installed router registers the local MCP connection and loads the editor's 26 specialized skills on demand, so the agent's skill list stays compact.

Custom skills live in a user-visible directory with the same layout as ~/.codex/skills / ~/.claude/skills:

~/.openchatcut/skills//SKILL.md     (Windows: %USERPROFILE%\.openchatcut\skills\...)

Ask the agent to manage_skill create (or use the bundled skill-creator workflow) and it writes the SKILL.md there — editable and shareable by hand. Dropping a SKILL.md into that directory makes it available to the agent, and selecting a workflow from the chat's / command or the creative-mode picker activates it for the next message.

OpenChatCut exposes a Streamable HTTP MCP endpoint:

http://localhost:5199/api/external-mcp/mcp

The repository's root .mcp.json already contains the local connection. Before using timeline tools, run OpenChatCut and open the target project. Project listing, creation, and navigation tools do not require the editor to remain open.

Codex app/CLI and Claude Code use the same session workflow:

1. Call begin_edit_session and keep the returned editSessionId. Set approvalMode to manual (the default) or auto. 2. Pass that id to every project read/edit tool. Changes are applied only to an isolated draft. 3. Call review_edit_session when the draft is ready. 4. In manual mode, review, preview, select, and approve or reject the proposal inside the open OpenChatCut project. In auto mode, review_edit_session applies the complete draft immediately. The client can poll get_edit_session for applied, rejected, or discarded status.

Approval in Codex or Claude controls whether the client may call a tool. OpenChatCut project approval is required only for manual sessions; auto sessions explicitly bypass that review. Either mode commits the applied operations atomically as one undo step. If an auto session becomes stale, it returns an error instead of falling back to manual approval; discard it and start a new session. Only draft-safe project read/edit tools are exposed in these sessions. Generation, export, project deletion, and other immediate side-effect tools stay unavailable because a rejected proposal could not roll them back.

Codex

Add the following to your Codex configuration:

[mcp_servers.openchatcut]
url = "http://localhost:5199/api/external-mcp/mcp"

Claude Code

claude mcp add --transport http openchatcut \
  http://localhost:5199/api/external-mcp/mcp

You can then describe an editing task directly to the agent:

Start an OpenChatCut edit session. Read the draft, add a scratch sound effect
at 8 seconds on the second audio track, and add a glitch transition between
the adjacent video clips. Submit the draft for review and wait for the user to
approve it in OpenChatCut before reporting that the edit was applied.

External agents invoke the same internal editing tools and EditorCore commands as the editor itself. There are no separate project formats that can drift apart, and the live timeline is not changed while an external draft is being prepared.

Qoder

Qoder is one-click too: the guide's Connect button writes the endpoint and bearer token into Qoder's own settings file, keeping any unrelated settings and MCP servers already there.

```text ~/.qoder/settings.json (international build) ~/.qoder-cn/settin

GitHub Stars & Activity

2,743Stars
0Forks
0Open issues
TypeScriptLanguage

GitHub Popularity

GitHub stars2,743
Forks0
Open issues0
Primary languageTypeScript
License-
Stars gained today0
Created-
Last pushed-

Trending History

Trending statusnot on today's boards

Related GitHub Projects

1

heygen-com / hyperframes

TypeScript★ 61,674⑂ 0
→
2

mifi / lossless-cut

TypeScript★ 44,503⑂ 0
→
3

hypit-ai / hypit

TypeScript★ 21,565⑂ 0
→
4

HBAI-Ltd / Toonflow-app

TypeScript★ 17,382⑂ 0
→
5

waooAI / waoowaoo

TypeScript★ 14,537⑂ 0
→
6

krillinai / OpenCreator

TypeScript★ 12,778⑂ 0
→
7

Vincentwei1021 / video-shotcraft

TypeScript★ 11,476⑂ 0
→
8

mifi / editly

TypeScript★ 5,523⑂ 0
→

More Trending Repositories